Gelişmiş Arama

Basit öğe kaydını göster

dc.contributor.authorYilmaz, Ismail Cengiz
dc.contributor.authorYilmaz, Deniz
dc.contributor.authorKandemir, Onur
dc.contributor.authorTekin, Hamdi
dc.contributor.authorAtabay, Senay
dc.contributor.authorKaraca, Ulger Bulut
dc.date.accessioned2024-05-03T07:13:14Z
dc.date.available2024-05-03T07:13:14Z
dc.date.issued2024en_US
dc.identifier.citationYılmaz, İ. C., Yılmaz, D., Kandemir, O., Tekin, H., Atabay, Ş., & Bulut Karaca, Ü. (2024). Barriers to BIM implementation in the HVAC industry: an exploratory study. Buildings, 14(3), 788.en_US
dc.identifier.issn20755309
dc.identifier.urihttps://doi.org/10.3390/buildings14030788
dc.identifier.urihttps://hdl.handle.net/20.500.12294/4096
dc.description.abstractIn recent times, the rise of urbanization, industrialization, population growth, food security, and the COVID-19 pandemic have led to an increased demand for indoor spaces with efficient air conditioning systems. As a result, there is a growing interest in creating more complex HVAC systems to improve indoor spaces. Building information modeling (BIM) offers numerous benefits to the HVAC industry, such as clash detection, budget and time reductions, and increased efficiency. However, its implementation is currently hindered by various challenges. This research aims to identify the major barriers to BIM implementation in the HVAC industry in Turkey, using a questionnaire survey of 224 domain experts working in 42 different companies across various fields of the HVAC industry. The study utilized several statistical analyses to categorize and prioritize the most critical barriers, including reliability tests, exploratory factor analysis (EFA), confirmatory factor analysis (CFA), the Kaiser-Meyer-Olkin (KMO) test, Bartlett's test, and ranking of factors (IRI). The results indicate that the "Deficiencies of Infrastructure and Lack of Qualified Personnel (DIP)" factor group constituted the most significant barrier, followed by "Lack of Documentation and Specifications (LDS)", "Deficiencies of Case Studies and Project Drawings (DCP)", and "Lack of Motivation and Resistance to BIM (LMR)". Moreover, our research revealed that 60% of the participants' companies allocate less than 40% of their budgets to technological infrastructure, which hinders the adoption of BIM. To promote BIM in the HVAC sector, we recommend enhancing personnel capacity building, improving skills and knowledge about BIM, promoting guidelines, and providing free access to documentation for practitioners.en_US
dc.language.isoengen_US
dc.publisherMultidisciplinary Digital Publishing Institute (MDPI)en_US
dc.relation.ispartofBUILDINGSen_US
dc.identifier.doi10.3390/buildings14030788en_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectINFORMATION MODELING BIMen_US
dc.subjectCONSTRUCTIONen_US
dc.subjectINTEGRATIONen_US
dc.subjectREDUCTIONen_US
dc.subjectPROJECTSen_US
dc.titleBarriers to BIM Implementation in the HVAC Industryen_US
dc.title.alternativeAn Exploratory Studyen_US
dc.typearticleen_US
dc.departmentMühendislik ve Mimarlık Fakültesi, İnşaat Mühendisliği Bölümüen_US
dc.authorid0000-0003-3708-997Xen_US
dc.authorid0000-0003-1109-6397en_US
dc.authorid0000-0003-1480-9452en_US
dc.identifier.volume14en_US
dc.identifier.issue3en_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.institutionauthorYilmaz, Ismail Cengiz
dc.institutionauthorYilmaz, Deniz
dc.institutionauthorTekin, Hamdi
dc.authorwosidAAT-6575-2021en_US
dc.authorwosidJDL-1934-2023en_US
dc.authorwosidEBJ-6857-2022en_US
dc.authorscopusid57214892853en_US
dc.authorscopusid57203156898en_US
dc.authorscopusid57210701204en_US
dc.identifier.wosqualityQ2en_US
dc.identifier.wosWOS:001191462200001en_US
dc.identifier.scopus2-s2.0-85188833786en_US


Bu öğenin dosyaları:

Thumbnail

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster